Yugo Metals
Yugo Metals

Cajnice Project

50km² across 1 tenement in Republic of Srpska, Bosnia and Herzegovina

0km²
Total Area
0
Tenements
0
Prospects
0%
Ownership

Project Overview

Cajnice Project

The Cajnice Project comprises a single granted tenement of 50km² in the Republic of Srpska, Bosnia and Herzegovina. The project targets copper, gold, silver, zinc and lead mineralisation across multiple prospects identified through rock-chip and channel sampling programs.

Exploration to date has identified significant copper mineralisation at the Gramusovici and Majdan prospects, with rock samples returning up to 10.5% copper and 155 g/t silver. Gold-silver mineralisation has also been identified, with rock samples returning up to 2 g/t gold and 220 g/t silver.

Tenement Details

CajniceGranted

50km²

AuAgCuZnPb

Exploration Targets

Prospects & Results

CuAg

Gramusovici Copper

The Gramusovici prospect has returned high-grade copper results from channel and rock-chip sampling. A channel sample returned 1.4m @ 1.4% copper and 21 g/t silver. Rock-chip samples returned up to 10.5% copper and 155 g/t silver.

Exploration Results

Sample / MethodGradeASX Reference
Channel sample: 1.4m1.4% Cu, 21 g/t Ag
Rock-chip samplingUp to 10.5% Cu, 155 g/t Ag

ASX Announcement References

High-Grade Copper Results at Cajnice

Gramusovici prospect copper mineralisation
Enlarge

Planned Next Steps

  • Detailed geological mapping of the Gramusovici prospect
  • Additional channel sampling to define the extent of copper mineralisation
  • Initial drilling to test mineralisation at depth

Timeline reflects planned activities as disclosed in October 2025 investor presentation. Actual timing may vary.

CuAg

Majdan Copper

The Majdan prospect hosts copper-silver mineralisation in cliff exposures. Further sampling and geological mapping is planned to evaluate the extent and grade of the copper mineralisation.

Majdan prospect cliff exposure with copper mineralisation
Enlarge

Planned Next Steps

  • Systematic rock-chip sampling along cliff exposures
  • Geological mapping to define the extent of mineralised structures

Timeline reflects planned activities as disclosed in October 2025 investor presentation. Actual timing may vary.

AuAg

Gold-Silver Prospects

Multiple gold-silver occurrences have been identified across the Cajnice tenement, with rock samples returning up to 2 g/t gold and 220 g/t silver.

Exploration Results

Sample / MethodGradeASX Reference
Rock-chip samplingUp to 2 g/t Au, 220 g/t Ag

ASX Announcement References

Gold-Silver Results at Cajnice

Planned Next Steps

  • Follow-up soil and rock-chip sampling to define gold-silver targets

Timeline reflects planned activities as disclosed in October 2025 investor presentation. Actual timing may vary.

AgZnPb

Silver-Lead-Zinc

Silver-lead-zinc mineralisation has been identified from rock-chip sampling, with grades of up to 51 g/t silver, 1% zinc and 3% lead.

Exploration Results

Sample / MethodGradeASX Reference
Rock-chip samplingUp to 51 g/t Ag, 1% Zn, 3% Pb

ASX Announcement References

Silver-Lead-Zinc Results at Cajnice

Cajnice soil sampling results
Enlarge

Planned Next Steps

  • Follow-up sampling to better define the silver-lead-zinc targets

Timeline reflects planned activities as disclosed in October 2025 investor presentation. Actual timing may vary.

Planned Activities

Cajnice Timeline

Planned 2025/2026 exploration activities for the Cajnice Project

2025

Geological Mapping

Detailed geological mapping at Gramusovici and Majdan copper prospects.

2025

Channel Sampling

Additional channel sampling program at Gramusovici to define copper mineralisation extent.

2025–2026

Initial Drilling

Initial drilling to test copper mineralisation at depth at Gramusovici.

2026

Gold-Silver Follow-Up

Follow-up sampling at gold-silver and silver-lead-zinc prospects.

Timeline reflects planned activities as disclosed in October 2025 investor presentation. Actual timing may vary subject to regulatory approvals, weather, and funding.

Important Information

Forward-Looking Statements: This page may contain forward-looking statements regarding Yugo Metals Limited (ASX: YUG). These statements involve known and unknown risks, uncertainties, and other factors that may cause actual results to differ materially from those expressed or implied. Forward-looking statements are based on assumptions and contingencies which are subject to change without notice. Yugo Metals does not undertake any obligation to update forward-looking statements to reflect events or circumstances after the date of this page.

Competent Person Statement: Any information relating to exploration results or mineral resources is based on information compiled by competent persons as defined under the JORC Code (2012 Edition). Full details are available in the relevant ASX announcements.