Sockovac Project
60km² across 2 tenements in Republic of Srpska, Bosnia and Herzegovina
Project Overview
Sockovac Project
The Sockovac Project comprises two tenements — Doboj (50km², granted) and Petrovo (10km², grant pending) — covering 60km² in the Republic of Srpska, Bosnia and Herzegovina. The project targets nickel and cobalt mineralisation identified through historical Yugoslav-era drilling and confirmed by modern soil geochemistry.
Historical drilling from 1969–1970 returned up to 5.1m @ 6.6% nickel. Cobalt was not analysed historically. Modern soil sampling has defined a large nickel-cobalt anomaly exceeding 1,000 ppm Ni and 100 ppm Co over a 14km² area. The company plans twin-drilling to confirm the historical results using modern JORC-compliant methods.
Tenement Details
50km²
10km²
Exploration Targets
Prospects & Results
Sockovac Nickel-Cobalt
The principal prospect hosts high-grade nickel mineralisation confirmed by historical drilling. A large soil anomaly exceeding 1,000 ppm nickel and 100 ppm cobalt over 14km² demonstrates the scale of the target. Cobalt was not analysed in the historical drilling programs, representing potential additional upside.
Exploration Results
| Sample / Method | Grade | ASX Reference |
|---|---|---|
| Historical drilling (1969–1970) | Up to 5.1m @ 6.6% Ni | |
| Soil geochemistry | >1,000 ppm Ni and >100 ppm Co over 14km² |
ASX Announcement References
— Historical Nickel Results at Sockovac (also Prospectus)
— Large Nickel-Cobalt Soil Anomaly Confirmed


Planned Next Steps
- Petrovo tenement grant (pending)
- Twin-drilling program to confirm historical results using JORC-compliant methods
- Systematic drilling to test the extent of the 14km² soil anomaly
Timeline reflects planned activities as disclosed in October 2025 investor presentation. Actual timing may vary.
Project Video
Sockovac Project — Site Footage
Planned Activities
Sockovac Timeline
Planned 2025/2026 exploration activities for the Sockovac Project
Petrovo Tenement Grant
Awaiting grant of the Petrovo tenement (10km²) to complete the project area.
Twin-Drilling Program
Twin-drilling to confirm historical 1969–1970 nickel results using modern JORC-compliant methods.
Systematic Drilling
Systematic drilling across the 14km² nickel-cobalt soil anomaly to define the extent of mineralisation.
Timeline reflects planned activities as disclosed in October 2025 investor presentation. Actual timing may vary subject to regulatory approvals, weather, and funding.
Important Information
Forward-Looking Statements: This page may contain forward-looking statements regarding Yugo Metals Limited (ASX: YUG). These statements involve known and unknown risks, uncertainties, and other factors that may cause actual results to differ materially from those expressed or implied. Forward-looking statements are based on assumptions and contingencies which are subject to change without notice. Yugo Metals does not undertake any obligation to update forward-looking statements to reflect events or circumstances after the date of this page.
Competent Person Statement: Any information relating to exploration results or mineral resources is based on information compiled by competent persons as defined under the JORC Code (2012 Edition). Full details are available in the relevant ASX announcements.
Historical Results Disclaimer: The historical drilling results from 1969–1970 referenced on this page are sourced from historical reports and have not been verified by modern JORC-compliant methods. The company plans twin-drilling to confirm these results. Cobalt was not analysed in the historical drilling programs.