Bosnia and Herzegovina
Our Projects
Three exploration projects comprising five tenements across 190km² in Bosnia and Herzegovina

Asset Portfolio
Tenement × Commodity Matrix
Five 100%-owned tenements across three projects covering 190km²
| Tenement | Project | Area | Status | Au | Ag | Cu | Co | Ni | Zn | Pb | Sb |
|---|---|---|---|---|---|---|---|---|---|---|---|
| Sinjakovo | Sinjakovo | 50km² | Granted | — | |||||||
| Jezero | Sinjakovo | 30km² | Granted | — | — | ||||||
| Cajnice | Cajnice | 50km² | Granted | — | — | — | |||||
| Doboj | Sockovac | 50km² | Granted | — | — | — | — | — | — | — | |
| Petrovo | Sockovac | 10km² | Grant Pending | — | — | — | — | — | |||
| Total | 3 Projects | 190km² | 8 target commodities | ||||||||
Portfolio
Explore Our Projects
Planned Activities
Exploration Timeline
Planned 2025/2026 exploration activities across the portfolio
Sinjakovo Drilling
Initial shallow drilling at the Sinjakovo gold-in-soil anomaly.
Sockovac Twin-Drilling
Twin-drilling to confirm historical nickel results at Sockovac.
Cajnice Mapping & Sampling
Detailed geological mapping and channel sampling at Gramusovici and Majdan copper prospects.
Sinjakovo Geophysics
Ground geophysics (IP/SP) program over barite vein systems.
Resource Drilling
Follow-up resource drilling at Sinjakovo, subject to initial drilling success.
Systematic Exploration
Systematic drilling across the Sockovac 14km² nickel-cobalt soil anomaly.
Timeline reflects planned activities as disclosed in October 2025 investor presentation. Actual timing may vary subject to regulatory approvals, weather, and funding.
Jurisdiction
Bosnia & Herzegovina
An EU accession state with an established mining regulatory framework and a skilled workforce.
Infrastructure
- International airport at Sarajevo
- Industrial seaport at Bar
- Roads, railway, and power network
Foreign Miners Operating
- Adriatic Metals
- Mineco
- Arcelor Mittal
- Leviathan Gold
Interested in Our
Exploration Programs?
Stay updated with our latest exploration results and company developments
Important Information
Forward-Looking Statements: This page may contain forward-looking statements regarding Yugo Metals Limited (ASX: YUG). These statements involve known and unknown risks, uncertainties, and other factors that may cause actual results to differ materially from those expressed or implied. Forward-looking statements are based on assumptions and contingencies which are subject to change without notice. Yugo Metals does not undertake any obligation to update forward-looking statements to reflect events or circumstances after the date of this page.
Competent Person Statement: Any information relating to exploration results or mineral resources is based on information compiled by competent persons as defined under the JORC Code (2012 Edition). Full details are available in the relevant ASX announcements.