Yugo Metals
Yugo Metals

Sockovac Project

60km² across 2 tenements in Republic of Srpska, Bosnia and Herzegovina

0km²
Total Area
0
Tenements
0
Prospects
0%
Ownership

Project Overview

Sockovac Project

The Sockovac Project comprises two tenements — Doboj (50km², granted) and Petrovo (10km², grant pending) — covering 60km² in the Republic of Srpska, Bosnia and Herzegovina. The project targets nickel and cobalt mineralisation identified through historical Yugoslav-era drilling and confirmed by modern soil geochemistry.

Historical drilling from 1969–1970 returned up to 5.1m @ 6.6% nickel. Cobalt was not analysed historically. Modern soil sampling has defined a large nickel-cobalt anomaly exceeding 1,000 ppm Ni and 100 ppm Co over a 14km² area. The company plans twin-drilling to confirm the historical results using modern JORC-compliant methods.

Tenement Details

DobojGranted

50km²

Cu
PetrovoGrant Pending

10km²

AuNiCo

Exploration Targets

Prospects & Results

NiCo

Sockovac Nickel-Cobalt

The principal prospect hosts high-grade nickel mineralisation confirmed by historical drilling. A large soil anomaly exceeding 1,000 ppm nickel and 100 ppm cobalt over 14km² demonstrates the scale of the target. Cobalt was not analysed in the historical drilling programs, representing potential additional upside.

Exploration Results

Sample / MethodGradeASX Reference
Historical drilling (1969–1970)Up to 5.1m @ 6.6% Ni
Soil geochemistry>1,000 ppm Ni and >100 ppm Co over 14km²

ASX Announcement References

Historical Nickel Results at Sockovac (also Prospectus)

Large Nickel-Cobalt Soil Anomaly Confirmed

Sockovac project tenement map
Enlarge
Sockovac cross-section with planned twin-drilling locations
Enlarge

Planned Next Steps

  • Petrovo tenement grant (pending)
  • Twin-drilling program to confirm historical results using JORC-compliant methods
  • Systematic drilling to test the extent of the 14km² soil anomaly

Timeline reflects planned activities as disclosed in October 2025 investor presentation. Actual timing may vary.

Project Video

Sockovac Project — Site Footage

Planned Activities

Sockovac Timeline

Planned 2025/2026 exploration activities for the Sockovac Project

2025

Petrovo Tenement Grant

Awaiting grant of the Petrovo tenement (10km²) to complete the project area.

2025–2026

Twin-Drilling Program

Twin-drilling to confirm historical 1969–1970 nickel results using modern JORC-compliant methods.

2026

Systematic Drilling

Systematic drilling across the 14km² nickel-cobalt soil anomaly to define the extent of mineralisation.

Timeline reflects planned activities as disclosed in October 2025 investor presentation. Actual timing may vary subject to regulatory approvals, weather, and funding.

Important Information

Forward-Looking Statements: This page may contain forward-looking statements regarding Yugo Metals Limited (ASX: YUG). These statements involve known and unknown risks, uncertainties, and other factors that may cause actual results to differ materially from those expressed or implied. Forward-looking statements are based on assumptions and contingencies which are subject to change without notice. Yugo Metals does not undertake any obligation to update forward-looking statements to reflect events or circumstances after the date of this page.

Competent Person Statement: Any information relating to exploration results or mineral resources is based on information compiled by competent persons as defined under the JORC Code (2012 Edition). Full details are available in the relevant ASX announcements.

Historical Results Disclaimer: The historical drilling results from 1969–1970 referenced on this page are sourced from historical reports and have not been verified by modern JORC-compliant methods. The company plans twin-drilling to confirm these results. Cobalt was not analysed in the historical drilling programs.