Cajnice Project
50km² across 1 tenement in Republic of Srpska, Bosnia and Herzegovina
Project Overview
Cajnice Project
The Cajnice Project comprises a single granted tenement of 50km² in the Republic of Srpska, Bosnia and Herzegovina. The project targets copper, gold, silver, zinc and lead mineralisation across multiple prospects identified through rock-chip and channel sampling programs.
Exploration to date has identified significant copper mineralisation at the Gramusovici and Majdan prospects, with rock samples returning up to 10.5% copper and 155 g/t silver. Gold-silver mineralisation has also been identified, with rock samples returning up to 2 g/t gold and 220 g/t silver.
Tenement Details
50km²
Exploration Targets
Prospects & Results
Gramusovici Copper
The Gramusovici prospect has returned high-grade copper results from channel and rock-chip sampling. A channel sample returned 1.4m @ 1.4% copper and 21 g/t silver. Rock-chip samples returned up to 10.5% copper and 155 g/t silver.
Exploration Results
| Sample / Method | Grade | ASX Reference |
|---|---|---|
| Channel sample: 1.4m | 1.4% Cu, 21 g/t Ag | |
| Rock-chip sampling | Up to 10.5% Cu, 155 g/t Ag |
ASX Announcement References
— High-Grade Copper Results at Cajnice

Planned Next Steps
- Detailed geological mapping of the Gramusovici prospect
- Additional channel sampling to define the extent of copper mineralisation
- Initial drilling to test mineralisation at depth
Timeline reflects planned activities as disclosed in October 2025 investor presentation. Actual timing may vary.
Majdan Copper
The Majdan prospect hosts copper-silver mineralisation in cliff exposures. Further sampling and geological mapping is planned to evaluate the extent and grade of the copper mineralisation.

Planned Next Steps
- Systematic rock-chip sampling along cliff exposures
- Geological mapping to define the extent of mineralised structures
Timeline reflects planned activities as disclosed in October 2025 investor presentation. Actual timing may vary.
Gold-Silver Prospects
Multiple gold-silver occurrences have been identified across the Cajnice tenement, with rock samples returning up to 2 g/t gold and 220 g/t silver.
Exploration Results
| Sample / Method | Grade | ASX Reference |
|---|---|---|
| Rock-chip sampling | Up to 2 g/t Au, 220 g/t Ag |
ASX Announcement References
— Gold-Silver Results at Cajnice
Planned Next Steps
- Follow-up soil and rock-chip sampling to define gold-silver targets
Timeline reflects planned activities as disclosed in October 2025 investor presentation. Actual timing may vary.
Silver-Lead-Zinc
Silver-lead-zinc mineralisation has been identified from rock-chip sampling, with grades of up to 51 g/t silver, 1% zinc and 3% lead.
Exploration Results
| Sample / Method | Grade | ASX Reference |
|---|---|---|
| Rock-chip sampling | Up to 51 g/t Ag, 1% Zn, 3% Pb |
ASX Announcement References
— Silver-Lead-Zinc Results at Cajnice

Planned Next Steps
- Follow-up sampling to better define the silver-lead-zinc targets
Timeline reflects planned activities as disclosed in October 2025 investor presentation. Actual timing may vary.
Planned Activities
Cajnice Timeline
Planned 2025/2026 exploration activities for the Cajnice Project
Geological Mapping
Detailed geological mapping at Gramusovici and Majdan copper prospects.
Channel Sampling
Additional channel sampling program at Gramusovici to define copper mineralisation extent.
Initial Drilling
Initial drilling to test copper mineralisation at depth at Gramusovici.
Gold-Silver Follow-Up
Follow-up sampling at gold-silver and silver-lead-zinc prospects.
Timeline reflects planned activities as disclosed in October 2025 investor presentation. Actual timing may vary subject to regulatory approvals, weather, and funding.
Important Information
Forward-Looking Statements: This page may contain forward-looking statements regarding Yugo Metals Limited (ASX: YUG). These statements involve known and unknown risks, uncertainties, and other factors that may cause actual results to differ materially from those expressed or implied. Forward-looking statements are based on assumptions and contingencies which are subject to change without notice. Yugo Metals does not undertake any obligation to update forward-looking statements to reflect events or circumstances after the date of this page.
Competent Person Statement: Any information relating to exploration results or mineral resources is based on information compiled by competent persons as defined under the JORC Code (2012 Edition). Full details are available in the relevant ASX announcements.